Minnesota · Gunite & Concrete Pool Builders · Updated 2026
4 gunite pool builders across Minnesota — custom concrete, shotcrete and gunite construction — ordered by customer rating and review count, with 2026 prices for a standard pool, a spa and the finish upgrades. City lists cover 5 Minnesota markets.
Choose a local list for customer ratings, review counts, 2026 prices and the questions to ask. Cities are sorted by listed company count.
A mid-size gunite pool (about 16×32) with a standard plaster finish in Minnesota typically runs $82,500–$132,000. Spas, premium finishes, features and decking are where custom pools climb from there:
| Job | Typical Minnesota price |
|---|---|
| Small gunite pool (about 12×24), plaster finish | $60,500–$88,000 |
| Mid-size gunite pool (about 16×32) | $82,500–$132,000 |
| Large or elaborate custom pool | $132,000–$275,000+ |
| Attached gunite spa with spillover | $16,500–$38,500 |
| Pebble or quartz finish upgrade | $5,500–$13,000 |
| Tanning ledge or beach entry | $3,500–$9,000 |
| Water features, lighting, fire bowls | $2,000–$16,500 |
| Decking and coping | $9,000–$27,500 |
| Rock or hard-dig excavation allowance | $3,500–$16,500 |
| Permits, engineering, soils report | $900–$4,400 |
Minnesota pricing is above the national baseline used for these estimates, mainly on labor and permitting. Gunite bids vary more than any other pool type because every element is custom — compare the shell thickness, steel schedule, finish, feature and equipment lines, not just the bottom number.
Spas, ledges, benches, lighting niches and water features are cheapest when they are shot into the shell — adding them later means cutting concrete.
PoolPad tracks 4 gunite pool builders across Minnesota, with city lists for 5 markets. PoolPad orders the list with a weighted score that combines customer rating and review count, so a long track record counts for more than a handful of scores.
Deep frost lines drive everything: plumbing depth, shell engineering, deck design, and equipment choices all assume months of hard freeze. Soils run clay to sand by neighborhood, and the compressed build season rewards builders who pull permits over winter for a first-thaw dig. Fiberglass and vinyl liner dominate for install speed; automatic covers and heaters are near-universal. Compact heated designs that stretch the season — and integrate hot tubs — are the local signature.
The largest listed markets are Plymouth (4 companies), Bloomington (3 companies), Burnsville (3 companies).
Ask for the shell engineering and the gunite crew's track record, read the structural, finish and equipment warranties separately, and compare at least three itemized bids for the same design. Minnesota licenses residential building contractors at the state level — verify the license and insurance before signing. Pool permits and residential-code barrier requirements (fences, self-latching gates) run through your city, and Twin Cities suburbs are organized, thorough, and worth asking your builder's recent timelines about.
A mid-size gunite pool with a plaster finish in Minnesota, MN typically runs $82,500–$132,000; small pools run $60,500–$88,000 and large custom designs $132,000–$275,000+. An attached spa adds $16,500–$38,500, a pebble or quartz finish $5,500–$13,000, and decking $9,000–$27,500. Minnesota pricing is above the national baseline used for these estimates, mainly on labor and permitting.
Both are concrete sprayed over a steel cage. Gunite is a dry mix with water added at the nozzle; shotcrete is wet-mixed concrete pumped through the hose. Each produces a strong shell when applied by a good crew — the nozzleman's skill, the mix design and proper curing matter more than which method is used. Ask which your builder uses and what thickness is specified.
Plan on eight to sixteen weeks from excavation to swimming: dig and steel in the first week or two, the shell shot and cured for about four weeks, then tile, coping, plumbing, equipment, decking and finally the plaster and fill. Permits add two to eight weeks before the dig. Freezing weather pauses shell and plaster work, so most builds are scheduled for the warm months.
The concrete shell can last 50 years or more. The plaster finish lasts about 10 to 15 years (quartz and pebble 15 to 20 or more), waterline tile and coping 15 to 25 years, and equipment 8 to 15 years. Balanced water, especially calcium hardness and pH, is what protects the finish.
The outdoor season in Minnesota runs June through early September — about 3 months unheated. A full professional winterization each fall protects plumbing and equipment through the freeze, and spring openings cluster into the same few weeks. June through early September unheated; heaters are effectively standard equipment. Winters are among the coldest in pool America, with frost that runs deep — the October close is engineered, not improvised.
MH3 Design Group has the highest customer rating on this Minnesota list at 5 stars across 44 reviews. Plan Pools & Concrete has the largest review count (91 reviews at 4.6 stars). PoolPad orders the list with a weighted score that combines customer rating and review count, so a long track record counts for more than a handful of scores.
Usually, for the same size: the shell is built on site, the finish is a separate trade, and custom features add up. The gap narrows for large pools and designs with spas and ledges, where fiberglass models are limited. Over 20 years a gunite pool also needs at least one resurfacing, which is part of its true cost.
Minnesota licenses residential building contractors at the state level — verify the license and insurance before signing. Pool permits and residential-code barrier requirements (fences, self-latching gates) run through your city, and Twin Cities suburbs are organized, thorough, and worth asking your builder's recent timelines about.
If your property is near a state line, check the neighboring directories too.
Claim your free PoolPad listing, check gunite among the pool types you build, and show Minnesota homeowners planning a custom pool what you construct.