Home Pool Remodeling Utah West Valley City, UT

Utah · Pool Remodeling & Resurfacing · Updated 2026

Pool Remodeling in West Valley City

Resurfacing, tile and coping, or a complete makeover: 38 pool remodeling companies in the West Valley City area. Ratings, review counts, contact details and 2026 planning prices are below. 5 are listed as specialists for this work; the rest are pool builders that routinely handle it. This page shows the top 20.

Directory area: in West Valley City, UT Rankings are calculated separately for each directory; a company may appear in several.
38 Remodeling companies
4.7/5 Average customer rating
1,794 Customer reviews

Top 20 of 38 Remodeling companies in West Valley City, UT

Ordered by customer rating and review count across the West Valley City area. Listings include the available rating, contact details and location; confirm current credentials and scope directly.

Renovation & resurfacing specialists in West Valley City

M3 Concrete Coatings and Restoration – pool company in West Jordan, UT

Unclaimed Renovation & resurfacing specialist
4.9 (204 reviews)
Concrete
West Jordan, UT (801) 577-0401
Renu Pool Plastering – pool company in Lehi, UT

Unclaimed Renovation & resurfacing specialist
4.6 (62 reviews)
Pool Builder
Lehi, UT 3+ years in business (385) 214-5464

Unclaimed Renovation & resurfacing specialist
4.7 (15 reviews)
Pool Builder
Bountiful, UT 15+ years in business (801) 917-6639
Beehive State Pool Resurfacing – pool company in Bountiful, UT

Unclaimed Renovation & resurfacing specialist
4.6 (9 reviews)
Pool Repair
Bountiful, UT 7+ years in business (801) 784-6573

Unclaimed Renovation & resurfacing specialist
5 (1 reviews)
Pool Repair
West Valley City, UT (385) 401-7508

Pool builders serving West Valley City

Most pool builders also take on remodels, replastering and equipment upgrades — confirm the scope and the finish options when you call.

4.8 (273 reviews)
Pool Builder
Kaysville, UT 3+ years in business (385) 330-4911
Intermountain Aquatech Pools & Spas – pool company in Sandy, UT
4.3 (332 reviews)
Pool Builder
Sandy, UT 10+ years in business (801) 569-0120
Coversafe, Inc. – pool company in Salt Lake City, UT
4.9 (150 reviews)
Pool Builder
Salt Lake City, UT (801) 923-5685
Cover Care, LLC – pool company in West Valley City, UT
4.5 (129 reviews)
Pool Builder
West Valley City, UT 7+ years in business (801) 601-8712

Planning a new pool as well? The West Valley City pool builders directory ranks all 144 builders in the area.

West Valley City Remodeling Prices · 2026

What Pool Remodeling Costs in West Valley City

Resurfacing is the anchor job: a standard white plaster replaster in West Valley City typically runs $5,500–$11,000, while pebble and quartz finishes run $9,000–$20,000. Everything else stacks on top of that:

JobTypical West Valley City price
Replaster (white plaster)$5,500–$11,000
Pebble or quartz finish$9,000–$20,000
Waterline tile$2,800–$8,800
Coping replacement$3,300–$9,900
Deck resurfacing$4,500–$13,000
Equipment upgrade (pump, filter, heater, automation)$3,500–$11,000
Add an attached spa$16,500–$38,500
Full remodel (finish, tile, coping, deck, equipment)$16,500–$66,000+

Utah pricing is above the national baseline used for these estimates, mainly on labor and permitting. Plaster has a finite life — 10–15 years for white plaster, 15–20+ for pebble — so a resurfacing quote is often the moment to price tile, coping and equipment in the same drain.

Renovated swimming pool with a new finish and tile in West Valley City
A replaster in West Valley City runs about $5,500–$11,000; pebble and quartz finishes $9,000–$20,000.
Hiring · Pool Remodeling

What a remodel quote should itemize

  • Drain, prep and bond coat. How the old finish is removed or roughed up (chip-out vs. bond coat) and who handles the drain permit and disposal.
  • Finish material and warranty. Plaster, quartz, pebble or glass bead — with the manufacturer warranty and the applicator's own workmanship term in writing.
  • Tile and coping. Waterline tile, step trim, coping material and whether the expansion joint is re-caulked.
  • Equipment and plumbing. Any pump, filter, heater, light or automation swaps, plus new returns or a skimmer if the shell needs them.
  • Startup chemistry. New plaster needs a 28-day brushing and balancing routine — ask who does it and what it costs.

Questions to ask before you sign

  1. How many resurfacing jobs did you complete last year, and can I see two nearby that are five or more years old?
  2. Is the finish installed by your own crew or a subcontractor, and who holds the workmanship warranty?
  3. What happens if the drained shell shows hollow spots, rebar or structural cracks?
  4. Which items in the quote are allowances that could change once the pool is empty?
  5. How long will the pool be down, and who handles the fill and the 28-day startup?
New waterline tile and coping on a remodeled pool in West Valley City
Tile, coping and lighting cost least while the pool is already drained.

Price the extras while the pool is empty

Tile, coping, LED lights, a tanning ledge or an attached spa cost far less during a resurfacing than as a separate job later.

West Valley City Pool Remodeling Snapshot

Highest Customer Rating

Babbitt Swimming Pool Plastering & Renovation

5 stars from 1 reviews

View Company →

Most Reviewed

Intermountain Aquatech Pools & Spas

332 reviews, 4.3 star average

View Company →

Directory Totals

West Valley City market

4.7 average customer rating · 1794 reviews · 38 companies · 5 specialists

See All on the Map →

Pool Remodeling & Resurfacing in West Valley City

38 pool remodeling companies in the West Valley City area. 5 are listed as specialists for this work; the rest are pool builders that routinely handle it. The ranked companies average 4.7 stars across 1,794 customer reviews. PoolPad orders the list with a weighted score that combines customer rating and review count, so a long track record counts for more than a handful of scores.

Bench lots bring slope, rock, and view engineering into play; valley soils vary from clay to gravel and reward soils-aware builders. Altitude affects heater sizing up north, and St. George builds dig caliche and plan for 110° summers. Gunite with tanning ledges and mountain views leads; fiberglass is growing fast in the suburbs. Automatic covers are near-standard, and St. George builds borrow Arizona's pebble-and-shade playbook.

For statewide rankings, city counts and Utah prices, see the Utah pool remodeling directory, or check the nearby cities below.

Common remodel projects in West Valley City

  • Resurfacing — replastering, or upgrading to a quartz or pebble finish that lasts longer and hides chemistry marks better.
  • Tile and coping — replacing a failing waterline tile band, cracked coping or a deteriorated expansion joint.
  • Deck work — resurfacing overlays, new pavers or travertine, drainage fixes and extending the patio.
  • Features and equipment — tanning ledges, spas, LED lighting, water features, variable-speed pumps, salt systems and automation.

Vetting a West Valley City remodeling contractor

Ask for nearby resurfacing jobs that are several years old, not just fresh ones. Confirm licensing where Utah requires it, insurance, and who holds the finish warranty. Compare at least three itemized bids against the same scope: finish, tile, coping, deck, equipment and startup. Utah licenses contractors at the state level through DOPL — verify the license classification and insurance. Pool permits and residential-code barrier requirements (fencing, self-latching gates) run through your city, and HOA architectural review is common in newer developments.

West Valley City Pool Remodeling Questions

How much does it cost to resurface a pool in West Valley City?

A standard white plaster replaster in West Valley City, UT typically runs $5,500–$11,000; quartz and pebble finishes run $9,000–$20,000. Waterline tile adds $2,800–$8,800 and new coping $3,300–$9,900. A full remodel that also updates the deck and equipment runs $16,500–$66,000+. Utah pricing is above the national baseline used for these estimates, mainly on labor and permitting; get itemized bids from at least three of the pool remodeling companies listed here for your pool's size and condition.

How often does a pool need to be replastered?

White plaster typically lasts 10–15 years; quartz and pebble finishes 15–20 or more with balanced water. Roughing, staining that no longer cleans, exposed aggregate, hollow spots and rust marks from the rebar are the signs the finish is at the end of its life. Etching accelerates when pH and calcium hardness run low, so a consistent water-care routine is the cheapest way to delay the next resurfacing.

How long does a pool remodel take in West Valley City?

A straightforward resurfacing usually keeps the pool down for one to two weeks: drain, prep, finish, cure and fill, followed by a 28-day startup brushing routine. Adding tile, coping and deck work extends that to three to six weeks, and equipment or structural changes can push a full renovation past two months. Most crews schedule remodels for the shoulder seasons so the pool is ready when the season starts.

Should I resurface or remodel the whole pool?

Resurface if the shell, tile, coping and equipment are sound and you mostly dislike the finish. Remodel when several systems are at the end of their life at once — a drained pool is the cheapest moment to replace tile and coping, add a tanning ledge or spa, move to LED lights, or install a variable-speed pump and automation. Ask each contractor to price the resurfacing alone and the bundled options separately so you can see the marginal cost of each upgrade.

How long is the pool season in West Valley City?

The outdoor season in West Valley City runs mid-May through September — about 4 months unheated. A full professional winterization each fall protects plumbing and equipment through the freeze, and spring openings cluster into the same few weeks. Mid-May through September along the Wasatch Front, with dry heat and cool nights; St. George runs closer to six-plus months of desert season. Northern winters freeze properly — full closes are standard — while the south winters light.

Which West Valley City pool remodeling company has the highest customer rating?

Babbitt Swimming Pool Plastering & Renovation has the highest customer rating on this West Valley City list at 5 stars across 1 reviews. Intermountain Aquatech Pools & Spas has the largest review count (332 reviews at 4.3 stars). PoolPad orders the list with a weighted score that combines customer rating and review count, so a long track record counts for more than a handful of scores.

Do pool remodeling contractors in Utah need a license?

Utah licenses contractors at the state level through DOPL — verify the license classification and insurance. Pool permits and residential-code barrier requirements (fencing, self-latching gates) run through your city, and HOA architectural review is common in newer developments.

What does a remodel warranty usually cover?

Plaster and pebble finishes normally carry a manufacturer material warranty (often 5–10 years, sometimes limited or prorated) plus the installer's workmanship warranty (commonly 1–5 years) covering delamination, spot etching from improper startup and bond failure. Tile, coping and equipment carry their own terms. Read what voids coverage — most exclude damage from unbalanced water — and keep your startup and water-test records.

Map of Remodeling companies Near West Valley City

Do You Remodel Pools in West Valley City?

Claim your free PoolPad listing, check the services you offer, and show West Valley City homeowners planning a renovation what you do.